PRODUCT: SuperBase Pro 1500, SuperBase Pro 2000 Connect your device to WiFi. Navigate to the firmware update section in your device settings. Select the option to update your AC firmware. Wait for the update to complete. Please note that Bluetooth is ...
Upon receiving your Home Panel, please follow the provided installation instructions. After installation, ensure that both the Home Panel and the SuperBase V are online, and update all firmware to the most recent version. There are two ways to enable ...
This warranty is only available to customers who purchased from Zendure’s official websites, Zendure Amazon stores or any Zendure authorized retailers. Parties wishing to participate in the Warranty Program must abide by the procedures and ...
Smart CT Mode is a Cloud-base feature, so you need to keep the SolarFlow and the ‘sensor’ devices have stable Wi-Fi connections all the time. Smart CT Mode Introduce the function of Smart CT Mode and its advantages and disadvantages Smart CT Mode is ...
1. We recommend setting the discharge limit to 10% to prolong the lifespan of your device. 2. It is advised to set the action of the device to "Shutdown" after reaching the discharge limit. You can do this on the same page of the App. 3. In case of ...
Yes, set "Runtime required for each startup" in the Zendure APP to ensure the device operates for a sufficient duration after startup to achieve the expected effect.
① Maintain currently active smart plug loads to ensure the minimum operating time is met; ② Reduce the charging power of Tesla vehicles and the operating power of heat pumps; ③ If the total power consumption is still too high, turn off smart plug ...
1. On the Hems interface, click 【Home】 to enter 【Home Settings】, and select 【Load Control】 to enter the page. 2. Then click 【Load Settings】, find 【Usage Plan】 in the load configuration and click 【Add Time Plan】. 3. A setting window will pop up, the ...
The user can drag to adjust the load priority for custom sorting on the 【Load Control】 page, and the device with a higher priority will obtain power distribution first.