It can connect to 2 sets of photovoltaic panels, each set of photovoltaic panels has independent MPPT input, up to 750W. The maximum combined power of 2 MPPTs is 1500W.
Yes, it is necessary for the SolarFlow 800 Plus to be connected to Wi-Fi and the Zendure App. The Zendure App is used for system settings, mode selection, and remote monitoring. Please ensure that the device is connected to a Wi-Fi network to achieve ...
Smart Matching Mode is a Cloud-base feature, so you need to keep the SolarFlow and the ‘sensor’ devices have stable Wi-Fi connections all the time. Smart Matching Mode Introduce the function of Smart Matching Mode and its advantages and ...
Smart CT Mode is a Cloud-base feature, so you need to keep the SolarFlow and the ‘sensor’ devices have stable Wi-Fi connections all the time. Smart CT Mode Introduce the function of Smart CT Mode and its advantages and disadvantages Smart CT Mode is ...
Any single PV input should not be subjected to an open circuit voltage (MPPT voltage) of more than 60V, and our recommendation is to limit it to 55V or below. When connecting multiple solar panels in parallel, make sure that the total maximum current ...
This warranty is only available to customers who purchased from Zendure’s official websites, Zendure Amazon stores or any Zendure authorized retailers. Parties wishing to participate in the Warranty Program must abide by the procedures and ...
Smart CT Mode is a Cloud-base feature, so you need to keep the SolarFlow and the ‘sensor’ devices have stable Wi-Fi connections all the time. Smart CT Mode Introduce the function of Smart CT Mode and its advantages and disadvantages Smart CT Mode is ...
1. We recommend setting the discharge limit to 10% to prolong the lifespan of your device. 2. It is advised to set the action of the device to "Shutdown" after reaching the discharge limit. You can do this on the same page of the App. 3. In case of ...
1. On the Hems interface, click 【Home】 to enter 【Home Settings】, and select 【Load Control】 to enter the page. 2. Then click 【Load Settings】, find 【Usage Plan】 in the load configuration and click 【Add Time Plan】. 3. A setting window will pop up, the ...
The user can drag to adjust the load priority for custom sorting on the 【Load Control】 page, and the device with a higher priority will obtain power distribution first.
The user must complete the addition of the load devices to be scheduled in the App and add the power consumption plan for the added devices. If only the devices are added but no power consumption plan is added, the load scheduling cannot be started.
The main CT must be connected to the main electric box, and the sub electric box can be connected to the sub CT. However, the circuits of Tesla and the heat pump must finally converge to the main electric box. If they are two completely different ...
1. After the user adds the Shelly relay connected to the heat pump to the Zendure App, the user can rename the relay and modify its icon for selection in HEMS. 2. The user unbundles the binding relationship between the Shelly relay and the Zendure ...