In a single-phase power system, install the PowerHub after the main switch in the distribution panel so that all household power passes through it. Install a new breaker after the PowerHub with a rated current ≤ the maximum circuit capacity to prevent output current from exceeding the circuit limit.After connecting a SolarFlow 4000 Mix Pro/AC+, whole-home off-grid backup is supported.